Condition of Property
- This was an empty “Gray Shell” retail suite
- The storefront glass and doors were all installed along with the entire exterior completed
- There were existing suites next door to this endcap that had already been built out when we started
- There was no electrical or HVAC, the plumbing had a common grease trap already installed, and the sewer line was stubbed up into the building
Cost
- The cost range of construction for the interior build-out to a completed restaurant was approximately $300,000
- Budgetary Cost of design & Engineering: Did not disclose
- Tenant Improvement dollars towards the cost of construction: Did not disclose
Timeframe
Time of Construction 2nd Quarter 2022
Duration of Construction 100 - 120 days