Condition of Property
- We started with an empty shell and went for the rough-in construction phase all the way to final completion with furniture and fixtures installed and ready to open for business.
Cost
- The cost of construction to complete the suite for the interior build-out was approximately $250,000, which included a budget increase for a better-performing air conditioning system. Our HVAC experts determined the need to keep the temperature consistent throughout the suite due to the specific requirements of the wax product. Failure to do so could have been extremely costly in the long run.
- Budgetary Cost of Design & Engineering: Did not disclose
- Tenant improvement Dollars towards the cost of Construction: Did not disclose.
Timeframe
Time of Construction 4th Quarter 2022
Duration of Construction 90 days